Stuart Weitzman Hall

Planning Strategy

The first major capital project for the Weitzman School of Design in more than 50 years, Weitzman Hall will be renovated and expanded, doubling the existing space. Formerly known as Morgan Hall, the building was part of the Foulke and Long Institute, an orphanage. Stuart Weitzman Hall shares the brick, north Italian vocabulary with other buildings of the Pepper era and plays a major role in defining the character of 34th Street. The renovation and expansion project is currently in the schematic design phase.

Program

The new addition on the east side will feature a grand entrance foyer, a glass-walled exhibition gallery that opens to a covered outdoor patio, individual and multi-seat studios, large smart classrooms and critique spaces, and faculty offices. The design retains historic architectural elements of the original structure, including the façade, the porch, and the balcony above the 34th street entrance. Construction on the $57M Weitzman Hall is scheduled to begin in 2024, with an anticipated completion in 2025.

Stuart Weitzman Hall

Stuart Weitzman Hall

Building Code: 350
Phase: Planned
Year Built: 1892
Floors: 4
Trustee Date: 4/2/01
Other Name: Morgan, Nursing, The Morgan Laboratory of Physics, Foulke Long Institute, Weitzman School of Design
Building Manager
Wellman, Jr., Karl M.